Shillong, Nov 3: The Meghalaya Power Distribution Corporation Limited (MePDCL) has informed that there will be no power supply for six days from November 4 to November 9 with effect from 9 am to 3 pm in parts of Shillong due to construction of the new KV line at Mawlyndep.
In a shut down notice, the MePDCL said that the areas to be affected by the construction of 33KV MES Feeder include – MES Assam Regimental Centre, Assam Rifles Office Complex, Assam Rifles Residential, MES Hospital, PGCIL, NERPC, NERLDC, Anthropological Survey of India, whole of Happy Valley, Mawshbuit, Madanrting, Wahrynthi, Laitkor Wahkdait and its adjoining areas.
The areas to be affected by the construction of the 33KV Lad Smit Feeder are DGAR, Umphynai, Sohryngkham, Mawryngkneng, Mawlyndep, Puriang, Smit, Nongkrem, Thangsning, Jongsha, Mawkynrew, Kharang and its adjoining areas.
The MePDCL assured that efforts will be made to complete the work in time.
Also Read:Â Dora from Tura joins historic marathon in New York City
Also Watch
Find latest news from every corner of Northeast India at hubnetwork.in, your online source for breaking news, video coverage.
Also, Follow us on-
Twitter-twitter.com/nemediahub
Youtube channel-Â www.youtube.com/@NortheastMediaHub2020
Instagram-Â www.instagram.com/ne_media_hub
Download our app from playstore – Northeast Media Hub