The assessment reveals that blockages in the drainage systems, caused by ongoing construction in Indoor Hall 1 and Indoor Hall 2, combined with heavy torrential downpour, resulted in water saturation and accumulation throughout the stadium, ultimately leading to the collapse of the retaining wall.