Shillong, Feb 26: Meghalaya-o Dam Rehabilitation and Improvement Project (DRIP) 32% mangni gita matchotaha aro iako 2028 bilsiode matchotatna ka·dongsoenga ine Metbah Lyngdoh, Assembly-o...
Shillong, Feb 26: Power Minister Metbah Lyngdoh, Meghalaya Power Generation Corporation (MePGCL)-ni gita Detailed Project Report (DPRs)-on·aha jeon dam 12 chonchongipa Hydro Power Project...
Power Minister Metbah Lyngdoh informed the Assembly that the implementation of the Dam Rehabilitation and Improvement Project (DRIP) is 32% complete and on track for completion by 2028, aiming to boost dam safety and performance in Meghalaya.
Power Minister Metbah Lyngdoh announced that Meghalaya Power Generation Corporation (MePGCL) has completed the detailed project reports (DPRs) for 12 small hydro power projects (63 MW) and approved two self-identified projects (37.5 MW), securing 12% free power and 1% LADF for the state.
Power Minister AT Mondal on Thursday said the Meghalaya Power Generation Corporation (MePGCL) is on the job to clear the tons of garbage floating and polluting the Ganol River following heavy rain to prevent it from affecting the power project.
With the monsoon season fast approaching, the Meghalaya Power Generation Corporation Limited (MePGCL) has initiated several measures to provide early warnings to public when the dam gates are opened, especially during sudden releases triggered by heavy rainfall. Among these is the installation of two high-range sirens to alert residents about water releases from the Ganol Hydro Dam in West Garo Hills district.
Shillong, Aug 22: Re•baenggipa sal 7 mangni gisepo jimbee mikkarang waagen ine Indian Meteorological Department (IMD)-ni mikrakataniko on•ata ja•man, Meghalaya Power Generation Corporation Limited...
In response to the Indian Meteorological Department's (IMD) weather warning issued on August 21, predicting heavy rainfall over the next seven days, Meghalaya Power Generation Corporation Limited (MePGCL) has commenced the controlled release of water from the Umiam Stage I Reservoir.
Abu Taher Mondal also took the opportunity to visit the Damsite and inspect the ongoing works undertaken as part of the Dam Rehabilitation and Improvement Project.